VERIFIED RESULTS

0%

Maximum Power Reduction

Confirmed by Onsite Air Enthalpy Method — JSRAE Annual Conference 2025, Tokyo

HOW THIS WAS MEASURED

What Testing Methods Were Used to Verify the Results?

Results were independently verified using two internationally recognized methods: the Onsite Air Enthalpy Method (virtual chamber normalization) and the Comparative COP Method (before/after efficiency comparison). Both methods confirmed significant improvement within 3 weeks of installation.

Onsite Air Enthalpy Method

23–24% power reduction

Uses virtual chambers to normalize outdoor temperature, indoor temperature, and heat source variables. Eliminates ambient variation to isolate the effect of ERT treatment on power consumption.

Comparative COP Method

10% efficiency improvement

Measures chiller/AC COP before and after installation. Chiller COP improved from 33% below spec to 23% below spec — a 10 percentage point recovery — within 3 weeks.


VERIFIED CASE STUDIES

What Are the Measured kWh Savings Across Real Installations?

Each case below reflects actual metered electricity consumption before and after Eco Pulsar installation, measured over comparable 12-month periods. CO₂ figures calculated at 0.44 kg/kWh.

Before (annual kWh)After Eco Pulsar
Modern factory production floor

Large-Scale Factory

Air Conditioning

28%

3t CO₂/yr saved

19,952 kWh

Before: 27,720 kWh

Commercial air conditioning and chiller units

Factory Complex

Chiller System

18%

3t CO₂/yr saved

35,424 kWh

Before: 43,200 kWh

Industrial cold storage warehouse aisle

Manufacturing Plant

Refrigeration System

16%

9t CO₂/yr saved

118,662 kWh

Before: 141,264 kWh

Hospital lobby interior

Hospital

Air Conditioning

22%

8t CO₂/yr saved

72,218 kWh

Before: 92,586 kWh

Supermarket refrigerated display aisle

Retail Store Chain

Air Conditioning

17%

32t CO₂/yr saved

395,134 kWh

Before: 476,064 kWh


INSTALLATION RECORDS

Which Industries Have Used Eco Pulsar?

Over 200 sites across Japan and Asia have installed Eco Pulsar units across diverse commercial and industrial categories.

Food Processing Factory

11 factories nationwide

21%

Hotel & Hospitality

8 locations

18%

Mushroom Cultivation

20 factories nationwide

21%

Supermarket Chain

15 locations

20%

Major Food Manufacturer

11 factories nationwide

18%

Bathhouse Facilities

17 locations nationwide

17%

Also successfully installed at: commercial facilities, department stores, offices, semiconductor factories, family restaurants, metalworking, data centers, cinemas, amusement facilities, airports.

Want to See Results for Your Facility?

Free verification test conducted before any commitment. We measure your existing baseline, install a trial unit, and provide a full comparison report.

Request Free VerificationView Specifications