KEY PERFORMANCE DATA
15–20%
Energy Savings
Electricity reduction per year. Up to 24% in laboratory-verified tests.
0.0kg
Ultra-Lightweight
Mounts directly on existing refrigerant pipe. No tools or downtime.
0W
Device Power Draw
Requires only AC 100V–240V and a lead wire contact.
0yr
Design Life
Zero maintenance. No consumable parts.
ENERGY SAVINGS RANGE
TECHNICAL SPECIFICATIONS
What Are the Technical Specifications of Eco Pulsar?
Designed for direct installation on existing refrigerant piping. No plumbing modifications, no refrigerant recharging, and no system downtime required during installation.
IN FULL TRANSPARENCY
When Is the Effect Reduced?
We believe in full transparency. The following environments may experience limited results. We conduct a free verification test before installation to confirm effectiveness.
New equipment (within 1 year)
New systems have not yet accumulated significant molecular clustering or sludge. The ERT effect will become measurable after 1–2 years of operation.
Twin-type multi-split systems
Systems where two compressors share a single refrigerant circuit may require multiple units or a specific installation configuration. A site assessment is required.
Low-polarity refrigerant systems
Certain low-polarity refrigerant types exhibit weaker intermolecular attraction, which limits the degree to which ERT can further reduce clustering. Effectiveness is confirmed during the free verification test.
Heavily modified systems
Systems that have undergone major refrigerant system overhauls may show different baseline measurements than factory-spec systems.
Systems with mechanical faults
Damaged compressors or refrigerant leaks must be repaired before installation for accurate verification results.
Very small residential units
Primarily designed for commercial and industrial systems. Small residential window units may show minimal effect.
Systems already at peak efficiency
A system operating at or above design spec will show minimal improvement from ERT treatment.
Ready to Install Eco Pulsar at Your Facility?
Free assessment, no obligation. We verify performance before commitment.