THE CHALLENGE
Industrial sites carry some of the heaviest cooling loads of any sector — process chillers plus comfort air-conditioning — and they are directly exposed to every increase in electricity prices.
High, price-exposed energy demand
Large chiller and AC loads mean energy is a major cost centre and a major risk when tariffs rise.
Downtime is expensive
Any efficiency retrofit that stops production is often a non-starter — the lost output outweighs the saving.
Mixed cooling systems
Sites run a mix of chillers and split/packaged AC, so a solution has to work across all of them.
HOW ECO PULSAR APPLIES
Restoring refrigerant efficiency in your existing system
Eco Pulsar treats the refrigerant in existing chiller and air-conditioning circuits with ERT — no cutting into pipework, no recharge, no shutdown.
Installation runs alongside live production, so there is no interruption to the line.
Whether the load is a central chiller or distributed AC units, restored refrigerant efficiency lowers the electrical work needed for the same cooling output.
How ERT worksVERIFIED RESULTS
MeteredVerified industrial results
Metered before/after electricity consumption over comparable 12-month periods.
Large-Scale Factory · Air Conditioning
Before: 27,720 kWh
Factory Complex · Chiller System
Before: 43,200 kWh
Verified, metered results. Eco Pulsar is also installed at semiconductor and metalworking factories within its 200+ site base. CO₂ at 0.44 kg/kWh.
WHY IT FITS MANUFACTURING & INDUSTRIAL
No production downtime
Installs alongside live operations.
Chillers and AC alike
One approach across mixed cooling systems.
Up to 28% measured
Verified reduction on a working factory's AC load.
Hedge against tariffs
Lower baseline demand reduces exposure to energy-price rises.
See what Eco Pulsar can save your facility
We start with a free on-site verification test — measuring your baseline, installing a trial unit, and giving you a full before/after comparison before any commitment.